OK, I guess it is my turn to have a XOJO problem.
Xojo just ‘hangs’ at Choose a Project (Not Responding)
As far as I know nothing has changed from yesterday.
It finally did come to life about 2 minutes later. I did re-install???
I installed 2.1 and now it takes minutes to load. WTF??
It seems to be coming back to life, in a normal amount of time. That was painful. Flashbacks from the days of a pagefile.
How much memory have you got? Perhaps it was busy doing something else? Strange things like this are always worth a restart.
I have 64 gb, intel 14900K. So that I don’t have to wait for things. It may have to do with the fact that my projects are on an NAS? Anyhow it is all back to normal. Thanks for your concern.
Use a sync tool for your NAS data like Synology Drive or similar. That’s what I do. Never ran into problems with Xojo.
Is it the network?
When Xojo tries to load the examples project list.
Thanks for the ideas. It has never been a problem before. Now it seems like it is all back to normal. I have never had a problem accessing the NAS. AS a matter of fact, while XOJO was out to lunch I opened the networked drive in an explorer window to see if there was a glitch, no problem. If it should happen again, I will look have into it further.